- Ar | En
On 17 June 2019, IGC finished the installation of F18 Platform in Foroozan Oilfield, (possessed in common with Saudi Arabia) located in the Persian Gulf, weighing 1200 Tons.
Read MoreThe F18 Jacket weighing 1800 Tons, transported from Qeshm yard and installed in Foroozan field in Persian Gulf Foroozan shared oil field with Saudi Arabia. Transportation and installation of F18 topside deck will be started subsequently within a short time.
Read MoreIran International General Contractor Co. (IGC) had presence in the 22nd International Oil, Gas and Petrochemical Exhibition in Tehran, 6-9 May 2017.
Read More
IGC has been introduced as the superior exporter of engineering services and equipment in electrical industry in 2016 and received a prize by Mr Chitchian the Power Minister. Undertaking numerous projects in Iraq, Turkmenistan in recent years was the main reason of introducing IGC in the Conference.
Read More
The South Pars Gas Field Development Phases 17-18, 19 and 20-21 were inaugurated by President Rouhani and Mr Zanganeh the Oil minister on 16 April 2017. Iran International General Contractor Co. (IGC) has had a prominent role in completion and commissioning of the mentioned projects.
Read More
IGC has started the execution of onshore work including civil, steel structure, piping, mechanical, electrical and instrument of South Pars Development Phase 14 Areas 1, 2, 10A, 10B & 10C. Industrial Projects Management of Iran (IPMI) is the Client of the mentioned projects.
Read More
Iran International General Contractor Co. (IGC) had presence in the 21st International Oil, Gas and Petrochemical Exhibition in Tehran, 5-8 May 2016.
Read More
Fabrication of Foroozan F18 Platform including the relevant tests will be finished by the end of March 2016.
Read More